A bathroom renovation is one of the most expensive home improvement projects you'll ever undertake. Done well, it adds genuine value and lasts decades. Done badly, you're back into the walls within five years fixing problems that should never have existed.

I do the plumbing side of bathroom renovations regularly across Orpington, Bromley, Sevenoaks and the wider Kent region — usually working alongside trusted local tilers, electricians and decorators. After 15+ years of bathroom work, here are the plumbing decisions that genuinely matter and the mistakes I see homeowners make again and again.

Plan the Plumbing Before You Plan the Look

This is the single biggest mistake — choosing your tiles and bathroom suite first, then trying to make the plumbing fit. The best bathrooms work the other way round.

Things to think about FIRST:

Shower Systems: The Most Important Decision

The shower is what your customers (well, family) will judge the bathroom by. A weak shower with poor flow and unstable temperature ruins an otherwise perfect bathroom.

Mixer Showers

Take hot and cold supplies and blend them. Reliability and quality of flow depends entirely on water pressure and flow rates of your hot water system. Excellent with mains-pressure unvented systems.

Thermostatic Mixer Showers

Same as above but maintain temperature when other taps are used elsewhere. Essential for safety in family bathrooms — no scalding when someone flushes a toilet.

Electric Showers

Heat cold water on demand. Independent of your hot water system — useful for ensuites or where hot water demand is high. Generally lower flow rates than thermostatic showers fed by good hot water systems.

Digital Showers

Premium thermostatic showers with electronic controls. Excellent temperature stability and convenience features. Significantly more expensive but genuinely lovely.

Critical sizing rule: A 9–10kW electric shower delivers around 5 L/min. A thermostatic mixer with a good unvented system can deliver 12–18 L/min. The difference is enormous in actual feel.

Concealed vs Exposed Pipework

Concealed pipework (chased into walls) looks beautiful. But it's also a minefield if not done correctly:

I always pressure-test the entire bathroom plumbing system at 1.5× working pressure before any tiling starts. If something's going to fail, I want it to fail before the tiler arrives.

Toilet Choice: Back-to-Wall vs Close-Coupled

Back-to-wall toilets with concealed cisterns look stunning. They also need:

Cheap back-to-wall systems are a false economy. The frame fails, the flush valve fails, and accessing the components is a nightmare. Spend properly here.

Basin Considerations

Three things people get wrong:

Heating: Towel Rail vs Radiator vs Underfloor

Many bathrooms now have heated floors. Done correctly, this is wonderful — warm tiles in the morning. Done badly, it's expensive to run and slow to warm up.

Decisions to make:

Waterproofing — The Most Important "Invisible" Job

Tanking (waterproofing) of wet areas is essential. Not all tilers do this properly. The tanking system should:

Skimping on this is the most common reason for bathroom leaks 2–5 years after renovation. Insist on it being done properly.

Realistic Project Costs

For a typical full bathroom renovation in our area:

Plumbing typically represents 20–30% of total cost. The other 70–80% is tiles, suite, electrical, decoration and labour for the other trades.

Working with the Right Trades

Smith EcoFlow handles the plumbing side. For the full bathroom, you'll need a tiler (specialist bathroom tilers are worth their weight in gold), a sparky for any electrical changes, and possibly a plasterer/decorator. We work alongside trusted local trades — happy to recommend people we know do good work.

Need a Local Plumber or Heat Pump Engineer?

CIPHE-qualified, covering Orpington, Bromley, Sevenoaks and Kent. Free quotes, no call-out fee, and honest advice.